Project Year: 2021

Project Overview:

Demoworx was engaged in November 2021 to facilitate the demolition of flood damaged Tauhara College. Demolition was to be completed before the start of the school holidays. Demolition of 1.5 Ha of school buildings and facilities was completed within 9 weeks, with the grass hydroseeded. The buildings had over 8000 SQM of asbestos and we worked alongside ACM removals to ensure the contract was delivered on time. Contract works were completed in time for school to return without interruption.